Trash Collection Monday, December 30th.
WCA will provide trash collection Monday, December 30th. Please set trash bins out by 7 am.
WCA will provide trash collection Monday, December 30th. Please set trash bins out by 7 am.
Bellaire Boulevard and Westmoor Drive were designated for roadway and drainage improvements as part of the Fort Bend County 2017 Mobility Program. The project scope includes a two-lane concrete boulevard with curb and gutter to complete the second half of a four-lane concrete boulevard for both roadways. Drainage will include additional curb inlets and manholes to tie into the existing trunk line. A portion of the trunk line will be constructed along Westmoor Drive to tie into the existing storm sewer. The total length of the project is 5,100 linear feet with the following project limits:
Additionally, sidewalk will be placed along the east side of Westmoor Drive between Bellaire Boulevard and Scrub Oak Drive. The estimated construction duration is 6 months.
The District has switched to smart meters for water and the attached document outlines steps to view your meter, view usage, and set up notifications to if there are leaks.